Friday, November 6, 2009

Walk-in Cooler Day 2

Day 2 progress on the walk-in cooler.

DSC03094
Final wall finished and insulated.

DSC03095
Insulation board cut and fit into ceiling.

DSC03097
Floor laid. 3 layers of 1" R5 insulation board, with 5/8" plywood on top, toenailed into the sides. The insulation board is so sturdy that no additional floor support was required.

DSC03098
Interior finished, except for sealing joints and painting.

DSC03103
Joints sealed with "Great Stuff" from HomeDepot.

DSC03113
Door Installed and painting commencing. Behr Porch Paint Ultra White is the route I went. 3 coats.

DSC03115
More painting.

This is where our day ended today. The AC unit is ordered (12,000 BTU) and the Cool Bot (storeitcold.com) is on the way. There is plenty of field work to keep us busy until they arrive.