Here is today's progress on the walk-in cooler. I hope to do an entire materials list at the end of the project and possibly a step by step.

DSC03053
1" R5 insulation board to fill walls

DSC03055
First wall framed and attached to the building wall. Foam board in part of the wall.

DSC03057
Expanding foam (Great Stuff from Home Depot) filing gaps in the foam board inside the walls.

DSC03059
First wall almost complete.

DSC03062
First wall complete.

DSC03064
Framing up the second wall.

DSC03066
Wall framed and stud nailed in place, ready for plywood to be attached.

DSC03067
Plywood being attached.

DSC03073
Three walls up. Completing the final outside wall.

More updates tomorrow.